We use cookies to make OHLA
USA's website a better place.
Cookies help to provide a more
personalized experience and relevant
marketing for you, and web analytics for us.

Learn More about our privacy policy
Skip to main content Skip to main navigation Skip to footer
OHLA USA - Home
    • Overview
    • Our Divisions
    • Our Leadership
    • Our History
    • OHLA Group
    • Safety & Quality
    • Awards & Recognition
  • Markets Vertical Construction
    • Commercial
    • Cultural/Entertainment
    • Education
    • Healthcare
    • Senior Living
    Transportation
    • Aviation
    • Bridges
    • Electrical & Signal Systems
    • Rail/Mass Transit
    • Resiliency & Recovery
    • Roads
    • Tunnels
    Environmental
    • Water
    Delivery Methods
    • Bid-Build
    • Construction Management At Risk (CMAR)
    • Design-Build
    • Design-Build-Finance
    • Public-Private Partnerships
    Services
    • Building Information Modeling
    • Construction Management
    • Design-Build Contracting
    • General Contracting
    • LEED Contracting
    • Preconstruction Services
    What We Do
  • Projects
  • Ethics and Integrity
    • Overview
    • Careers
    • Subcontractors & Suppliers
    • PPP & JV Partnering
    • Overview
    • News
    • Global Publications
    • Overview
    • Locations
  • Company
    • Overview
    • Our Divisions
    • Our Leadership
    • Our History
    • OHLA Group
    • Safety & Quality
    • Awards & Recognition
  • What We Do
  • Projects
  • Ethics and Integrity
  • Work With Us
    • Overview
    • Careers
    • Subcontractors & Suppliers
    • PPP & JV Partnering
  • Media
    • Overview
    • News
    • Global Publications
  • Contact
    • Overview
    • Locations

Widening Roadway & Bridges on State Highway 130

  • Home
  • Projects
  • Project Details

OHLA USA performed two contracts totaling $92.9 million to widen and improve 22 miles of State Highway 130 and its associated 14 bridges for our client, the Texas Department of Transportation. The project featured the construction of an additional main lane in each direction, auxiliary lanes between ramps, widening shoulders, bridges, and culverts, installation of infrastructure for an Intelligent Transportation System (ITS), and other improvements to enhance safety and driver reliability. The project stretched from the eastern side of Austin from State Highway 45 as the project’s northern limit, to US 71 as the southern limit, with US 290 dividing the two contracts.

Since more than 150,000 cubic yards of concrete were required, OHLA USA procured a mobile concrete plant and assembled it on site. The ability to manufacture the concrete in close proximity to where it was needed saved time and money. In addition to concrete pavement, the construction team was also responsible for earthwork, grading, utilities, and bridge construction including installation of cast-in-place and precast substructure, pre-cast bridge beams, pre-cast bridge deck panels, and cast-in-place bridge deck work at 14 different bridges.

Project Details

Project Name

Widening Roadway & Bridges on State Highway 130

Location

Austin, TX

Division

OHLA USA, Inc.

Project Owner

Texas Department of Transportation

Market

Transportation

Sub Market

Roads

Delivery Method

Bid-Build

Service

General Contracting

Region

Central

View All Projects

Related Sub Market

Related Sub Market

Roads

Let's Get Started

Driven by a passion to create a better world - we're here to help. Contact us to learn more.

Contact Us
OHLA
  • © OHLA USA. All Rights Reserved.
  • Sitemap
  • OHLA USA Privacy Policy
  • Ethics and Integrity
  • linkedin
  • Facebook
  • Instagram