We use cookies to make OHLA
USA's website a better place.
Cookies help to provide a more
personalized experience and relevant
marketing for you, and web analytics for us.

Learn More about our privacy policy
Skip to main content Skip to main navigation Skip to footer
OHLA USA - Home
    • Overview
    • Our Divisions
    • Our History
    • OHLA Group
    • Safety & Quality
    • Climate Change
    • Awards & Recognition
  • Projects
  • Markets
    Vertical Construction
    • Commercial
    • Cultural/Entertainment
    • Education
    • Healthcare
    • Senior Living
    Renewable Energy
    • Solar
    Environmental
    • Water/Wastewater
    Transportation
    • Aviation
    • Bridges
    • Electrical & Signal Systems
    • Rail/Mass Transit
    • Resiliency & Recovery
    • Roads
    • Tunnels
    Services
    • Building Information Modeling
    • Construction Management
    • Design-Build Contracting
    • General Contracting
    • LEED Contracting
    • Preconstruction Services
    Delivery Methods
    • Bid-Build
    • Construction Management At Risk (CMAR)
    • Engineer-Procure-Construct
    • Design-Build
    • Design-Build-Finance
    • Public-Private Partnerships
    What We Do
    • Overview
    • Careers
    • Subcontractors & Suppliers
    • PPP & JV Partnering
  • Ethics and Integrity
    • Overview
    • News
    • Global Publications
    • Overview
    • Locations
  • Company
    • Overview
    • Our Divisions
    • Our History
    • OHLA Group
    • Safety & Quality
    • Climate Change
    • Awards & Recognition
  • Projects
  • What We Do
  • Work With Us
    • Overview
    • Careers
    • Subcontractors & Suppliers
    • PPP & JV Partnering
  • Ethics and Integrity
  • Media
    • Overview
    • News
    • Global Publications
  • Contact
    • Overview
    • Locations

Alvarado 2nd Pipeline Extension

  • Home
  • Projects
  • Project Details

OHLA USA is serving as the prime contractor for the $123.2 million Alvarado 2nd Pipeline Extension, a project that will ensure the continuity of reliable, environmentally sustainable water service to San Diego’s growing population.  

The contract calls for the construction of approximately 10 miles of water main in the Mission Valley and Mission Bay areas of the city. New 24-inch and 48-inch transmission mains will be installed along the Friars Road corridor between Frazee Road and Qualcomm Way, where they will connect to the existing Alvarado Pipeline. OHLA crews will also construct the mains along West Mission Bay Drive, where they will connect to the recently completed Pacific Beach Pipeline.  

On San Diego’s Napa Street, the OHLA USA team will install a new 36-inch transmission main branch for future connection to the Morena Pipeline. The construction of a new pressure-reducing station, along with its associated equipment, is required to support the expanded water service. 

The contract’s other major scopes of work include the replacement of a 12-inch distribution main along Sea World Drive. 

This critical infrastructure investment will improve water delivery reliability for San Diego communities for decades to come. 

Project Details

Project Name

Alvarado 2nd Pipeline Extension

Location

San Diego, CA

Project Owner

City of San Diego

Market

Environmental

Sub Market

Water/Wastewater

Delivery Method

Bid-Build

View All Projects

Related Sub Market

Related Sub Market

Water/Wastewater

Let's Get Started

Driven by a passion to create a better world - we're here to help. Contact us to learn more.

Contact Us
OHLA
  • © OHLA USA. All Rights Reserved.
  • Sitemap
  • OHLA USA Privacy Policy
  • Ethics and Integrity
  • linkedin
  • Facebook
  • Instagram